HOME   DISC GOLF   THE COURSE   EVENTS   CLUB   CONTACT   DISC SALES      
           

   

I am always looking at ways to improve Quarry Park, be it in the form of: -

Improvements to hole design.
Enhancing the aesthetics of the course.
Improving safety.
Facilitating maintenance.
Adding new facilities.
For the most part simply maintaining the 15 acre course is more than enough to keep me busy. Volunteer help is very much appreciated and I think it can be fun and rewarding for volunteers to do their bit to help. With the 2008 British open taking place in May this year I need to improve access, safety, signage, ease of maintenance and general appearance. I have a worklist of jobs for 2008 (below) and assistance is welcomed. There are a few other big jobs requiring machinery. If you have some bright ideas or comments or wish to assist with labour, advice or finance, please get in touch or post your suggestion to the yahoogroup?

I have noted down some of the previous projects to impove the course, and given credit to the people who have made them happen.

Course Improvements - 2008 Worklist
Work parties on March 22nd, April 12th and May 17th are planned. I provide food and drink for helpers, plus a free disc. Come prepared with boots/wellingtons and gloves.

The following list indicates Hole, Priority (Low, Medium, High), Time (approximate in mins), and the Task

3 M 60 Level ground by tees
4 L 120 Reduce density of branches of evergreen
5 L 90 Remove pallet, angle iron and wire from hedge nearest tee

5 M 90 Check and repair ditches
5 H 45 Make safe where there is a hole by the steel tubing
8 L 60 Add tee marker to left side
9 L 480 Repair and paint boat
10 M 300 Cut back dogwood
11 M 90 Level back tee and pin down mat
12 M180 Clear behind and to side of tee
12 L 120 Make bench behind tee
12 M 360 Enhance ditch on left
12 M 180 Widen fairway by pruning trees and removing some blackthorn
12 M 60 Make new OB line with rope and possibly new posts
12 M 150 Make lateral path from just below hole on left side
13 L 60 Reset bench with membrane and gravel under.
14 L 360 Make steps down at gap 10M before basket
14 L 90 Remove bramble and rubble behind basket
14 L 90 Prune dogwood in OB
15 M 60 Make access for mower in OB
17 M 90 Re-do brickwork for drain cover
17 L 90 Remove wire fence back left by clinic
18 M 15 Remove angle iron by last alder
18 L 60 Prune dogwood in OB
18 M120 Make safe the drain cover, concrete paving slab over?
18 M 240 Make good fence in front of shelter
Clubhouse L 240 Make shelf in shelter
Many M 720 New Tee posts ready for new signs

Course Improvements - Completed
Here are some of the main jobs that have been completed over the years: -

Demolish old tin field shelter and replace with new timber one. Special thanks to Tony for clearance work.
Build bridge over stream on Avon Calling. Special thanks to Tony, Sue and Ivan.
Build ditches to drain Helen's Mire. Special thanks to Tony, Sue and Ivan
Aerial bunkers on River Ride. Special thanks to Tony, Sue and Ivan
Relaying hedge on Roc or Roll.
Removing old fencing on southern perimeter. Thanks to Tony, Sue and Ivan
Planting 100 trees. Special thanks to Sue and Ivan. Also Tony and Matt.
Remove enclosure fencing on 1, 2, 3, 4,13 and 16
Raised green on hole 15 and 16
Raised tee on 17
Level tee on 13









 



Access and Car park as at 29th March



Work in progress on the new entrance 23rd March 2006


... a week earlier


Some flash-flood defences would be nice

Paint dat boat!